Wednesday, August 10, 2016

4th year (2013-17 batch) Project Allocation




Department of Civil Engineering
Sharda University, Greater Noida

4th year (2013-17 batch)
Project Allocation


Project Preference Filling Form


Project List
 
Instructions for selection of projects:

·        You shall be required to make a group of 3-4 students (4 is the maximum limit and 3 is the minimum, more and less than these numbers are not allowed)
·        Fill the choice (maximum of 5 in the order of preference) on your blog. Based upon your choice(s) a project and a supervisor shall be allocated to you on which you shall have to work in this semester. The allotment of the project shall be done based upon your first preference on a first cum first basis. if your first choice is not available, next option shall be allotted and so on. We shall use the "time stamp" of google form for considering who has applied "first"
·        The projects have been designed in a manner that the same can be extended in the next semester and shall be for project-2
·        Once allotted, there shall be no change in the group and/ or topic/ supervisor
·        There shall be a rigorous monitoring of the project as per the guidelines (already provided to the supervisor), which shall also be shared with you by your supervisor
·        The thesis submission guideline shall also be made available to you through the supervisor
·        Any update to these shall also be made available to you through blog and/ or notices.


Last date for submission of the form (on the blog is) 16th August, 2016



Project Preference Filling Form


Project List

No comments:

Post a Comment